KINGREAL has designed this Economical Steel Sheet Coil Cut To Length Production Line for factories that do not require high productivity and can greatly reduce production costs. KINGREAL MACHINERY has been specializing in coil manufacturing for more than 20 years and is able to customize our products to meet the different needs of our customers.
The KINGREAL Economical Steel Sheet Coil Cut To Length Production Line is a machine used to cut coils of material into cut-to-length sheets.
The main workflow of the simple plate cutting production line is: the coil is taken out from the coil storage, processed by the front equipment, transported to the cutting machine, cut to the required length of the plate, and then discharged through the shearing discharge system to complete the whole production process.
The production line is simple to operate, compact and low maintenance, so it is widely used in various industries.
Raw material |
Copper,Galvanized plate, Stainless and so on |
Thickness |
0.3 mm to 1.0 mm |
Shearing Width |
80mm to 1250 mm |
Working Speed |
About 15 m/min |
Slitting Blade |
6 pcs |
Main Motor Power |
2.2KW |
Hydraulic Motor Power |
5.5KW |
Total Power |
7.7 |
Because of the simple construction of this metal cutting shears production line, its manufacturing cost is relatively low, so the purchase and maintenance cost is also relatively low.
The simple version of the cut-to-length line has a simple structure with few parts, making it easy to maintain and service.
Despite the simple design of the line, the line is also quite productive. The line can be customized to meet the needs of different lengths of plates, thus increasing production efficiency.
The cut-to-length production line can be applied to various fields where coils need to be cut into cut-to-length sheets, and is widely used in the production process of construction, automotive, marine, metallurgical and other industries.
Yes, KINGREAL STEEL SLITTER is a professional sheet metal processing machines manufacturer, we are an OEM.
We have been focusing on the field of machine manufacturing for more than 20 years.
There are 2 ways: either by plane or by train to Foshan/Guangzhou port. We will be picking you up in plane/train station, then we can go together.
Within 60-80 days after receiving prepayment. Some machines in stock, can be delivered at any time.
If buyers come to our factory to inspect, the training to install and operate is provided face to face.
If not, Manual book and video is provided to show how to install and operate.