Industry New

How To Correctly Carry Out The Test Run Of The Metal Coil Slitting Machine?

2023-10-19


Due to the production process, the metal slitting production line is configured with more parts and devices compared to other machines, and most factories are confused when they feel the machine




As a professional slitting cut to length line manufacturer in China, KINGREAL has successfully sold machines to Saudi Arabia, Turkey and India, assisting factories to solve the problems of machine installation and test run. Next, KINGREAL will give a few suggestions to help you.


About The Slitter Steel Device:


1. The seat of the machine base, the first pad iron leveling, its unevenness in all directions of the error per meter shall not be greater than 0.1mm, the machine base leveling after the initial grouting, must wait until completely dry and solid before allowing the installation of the machine debugging, tighten the ground bolt.

2. In the process of device dismantling, lifting the work rollers and precision processing of the parts, do not allow direct contact with the processing surface with a steel rope, should be padded felt to avoid abrasion.

3.  When installing the contact surface sealing and bolts should be coated with a thin layer of grease.

4. Tighten all fastening bolts and ground bolts evenly.



About Test Run Of The Steel Strip Slitting Machine

1. Before the test run, all moving parts must be unloaded (positive and rotary), and check the running condition of each part.

2. Turn on the main motor for leveling the host no-load test run, forward and reverse direction of continuous operation for 1 ~ 2 hours to check the connection and operation of various components, and check the braking effect of the leveling host brake.

3. Thought that after a good air run can be loaded test run, the same view of the machine parts condition, such as abnormalities should be immediately parked, check or adjust, eliminate abnormalities, and the test run, the steel sheet slitting machine should run smoothly without significant vibration and noise.

4. In the test run after passing, can be put into production, put into production in the machine parts are not completely break-in before the machine load shall not exceed 80% of the rated load.


It must be said that only after the successful trial operation of the single slitting machine, customers can put it into production to create benefits for the enterprise. Of course, you should also remember to maintain it properly.